
|
 |

Production
Production for the three months ended June 30, 2010 was 2,270 boe per day.
Reserves
Yoho's petroleum and natural gas reserves at September 30, 2010 are currently being prepared by the independent engineering firm of GLJ Petroleum Consultants ("GLJ").
|
 |